Issa Rae, Terrence J, And More Attend The TIME Impact Dinner
Red Carpet Rundown: Issa Rae, Terrence J, And More Attend The TIME Impact Dinner - Page 5
Share the post
Share this link via
Or copy link

Source: Craig Barritt / Getty
Issa Rae gives a touching speech at the TIME Impact Dinner
TIME Closer cover star Issa Rae, attended The Closers dinner, delivering an impactful speech that explained the importance of closing the racial wealth gap. “When I was younger, I had the audacity to believe I could change the world. In my defense, I was new to it, and so many of the problems I saw or heard about – poverty, war, homelessness, hunger, racism, sexism – all of them seemed so easy to fix. I was just like, people just need to do better by each other. If enough people cared to change something, then it will change. Then, as I got older and met more people and read about more problems, I was like, Ohh, what was I talking about,” she chuckled.
Source: Craig Barritt / Getty
1. Issa Rae

Issa Rae donned a classic all-black dress that she paired with a beautiful diamond necklace.
2. Issa Rae

The dress featured a deep-V back, accentuated with silver hardware on the curve of her back.
3. Gail Bean

Gail Bean graced the carpet in a brown mini dress that highlighted her toned arms.
4. Terrence J

Terrence J looked dapper in an all-black suit.
5. Angela Yee

Angela Yee wore a black and white ruffled blouse, partnered with a black skirt and black knee-high boots.
6. Tierra Whack

Tierra Whack wore a floral tunic that matched her red glasses and high ponytail perfectly.
7. Aurora James

Aurora James looked radiant in a red floor-length, long-sleeve, mock-neck dress.
-
Red Carpet Rundown: Celebrity Fashion From The 2026 Vanity Fair Oscars After-Party
-
If You Know, You Know: Inside Jay-Z & Beyoncé’s Gold Party After The Oscars
-
Red Carpet Rundown: The Dreamy Looks At Essence's Black Women In Hollywood
-
Smell So Good: Perfumes For Women That Smell Expensive (Even If They're Not)
