Issa Rae, Terrence J, And More Attend The TIME Impact Dinner
Red Carpet Rundown: Issa Rae, Terrence J, And More Attend The TIME Impact Dinner - Page 5
Share the post
Share this link via
Or copy link

Source: Craig Barritt / Getty
TIME launched their new list, The Closers, to celebrate 18 changemakers working to close the racial wealth gap. Last night, the publication hosted the TIME Impact Dinner, honoring the leaders for their hard work and contribution to the cause.
The racial wealth gap is an issue that extends across all industries. When Monique and Taraji P. Henson shared their experience with pay inequality, it revived the age-old conversation of why women, specifically women of color, fall victim to financial discrepancies.
Issa Rae gives a touching speech at the TIME Impact Dinner
TIME Closer cover star Issa Rae, attended The Closers dinner, delivering an impactful speech that explained the importance of closing the racial wealth gap.
“When I was younger, I had the audacity to believe I could change the world. In my defense, I was new to it, and so many of the problems I saw or heard about – poverty, war, homelessness, hunger, racism, sexism – all of them seemed so easy to fix. I was just like, people just need to do better by each other. If enough people cared to change something, then it will change. Then, as I got older and met more people and read about more problems, I was like, Ohh, what was I talking about,” she chuckled.

Source: Craig Barritt / Getty
“I grew more cynical, and I became a passive observer in many instances of the ills of the world, occasionally helping when convenient or where I thought I could or might, but it never felt like enough. And that’s the thing: the idea of changing the world is so daunting, so I chose to focus on myself and try to be better and focus on what I could do in my small environment, and then I focused on my family and then my friends and then my communities, and it led me to realize how I can make an impact in my own way,” she concluded.
The evening was filled with riveting speeches and even better red carpet looks.
1. Issa Rae

Issa Rae donned a classic all-black dress that she paired with a beautiful diamond necklace.
2. Issa Rae

The dress featured a deep-V back, accentuated with silver hardware on the curve of her back.
3. Gail Bean

Gail Bean graced the carpet in a brown mini dress that highlighted her toned arms.
4. Terrence J

Terrence J looked dapper in an all-black suit.
5. Angela Yee

Angela Yee wore a black and white ruffled blouse, partnered with a black skirt and black knee-high boots.
6. Tierra Whack

Tierra Whack wore a floral tunic that matched her red glasses and high ponytail perfectly.
7. Aurora James

Aurora James looked radiant in a red floor-length, long-sleeve, mock-neck dress.
-
An Ode To The Fashion Killer: Celebrating Patina Miller’s Raq Thomas
-
Style Gallery: Put Some Respect On Marlo Hampton’s Name When Talking About RHOA Fashion
-
Keke Palmer Is Hosting The 2026 CFDA Fashion Awards Because The Big Boss Stays Booked And In Style
-
28 Memorable Nip Slips & Wardrobe Malfunctions You HAVE To See Now (NSFW PHOTOS)